One Workplace
2910 Stevens Creek
1335 Terra Bella
1450 Chapin
BSB
Pier




Design/Build Redevelopment of existing 1970’s concrete tilt up building into new high tech office environment in the heart of Silicon Valley’s technology empire.
Redevelopment of former 200,000 SF industrial building into state of the art, award winning showroom, and office work environment.
Downtown redevelopment, conversion and modernization of existing 2 story tilt building.
Redevelopment of existing 2 story framed, mixed used building into new high end office/retail use directly adjacent to Santana Row.
PMC Sierra
Menlo Equities
240 Lorton
930 Brittan
Hampton Inn & Suites
Patioworld
OPI Corporate Office




New Top Shelf Restaurant in the heart of Willow Glen.
3 story Class A office and electronics lab fit up in a new warm shell.
Upgrade and remodel of the entire interior of San Francisco’s Historic Pier 1.
Interior renovation of a 5,500 sf office on Sand Hill Rd. Renovation included extensive walnut millwork and glass walls, Walnut and Arktura felt ceilings, new break area, private offices and a Prysm video wall at the conference room.




Construction of new 240 room, 5 story Hampton Inn on new subterranean post tensioned podium.
New 4 Story steel framed class A+ building constructed in zero lot line environment in downtown Burlingame inclusive of new parking elevator system on ground floor.
New 3 story steel frame office building as well as conversion of 3 existing buildings into lab incubator
Construction of new Turn Key Build to Suit Retail building with underground groundwater retention facilities.
